ADU Planning Checklist

Know what to ask before you commit to an ADU.

Use these 32 questions to review your property, plans, utilities, budget and next steps with your project team.

Property and permit records

Which agency handles this address?

Find the property address and parcel number. Confirm whether the City or County handles permits; the mailing city alone may not settle this.

What homes and other buildings are on the lot?

Gather available permit records and note the existing homes, garages and other structures. Ask which records the building department needs.

Is any existing work missing permits?

Tell the building department about known unpermitted work or open code cases. Ask how each affects this application and what to resolve.

What kind of ADU are you considering?

Note who will live there and your must-have features. Describe a separate building, addition or conversion. For a junior ADU, multifamily property or home on wheels, ask which approval path applies.

Land, hazards and restrictions

Are the boundaries and easements clear?

Bring any survey and title report. An easement gives someone rights to use part of the land. Ask whether a survey or further title review is needed.

Are there mapped hazards or special areas?

Ask about flood, wildfire, earthquake, landslide, coastal and historic designations. Record any extra design work, review or agency contact that applies.

What is on or under the proposed building area?

Point out slopes, retaining walls, old foundations, filled pools and drainage concerns. Ask your designer whether soil testing or an engineer is needed.

Which trees or existing features may be affected?

Mark trees, major roots, walls and structures on a sketch. Ask about protection, removal permits and demolition before choosing the building location.

Size, placement and use

How many units and what size can you propose?

Record the permitted unit types, floor area and how area is measured. Ask which state and local provisions apply to your property and project.

Where can the building go?

Confirm height, number of floors, distances from property lines (setbacks), separation from other buildings and any limits on covered yard area.

What happens to parking and entrances?

Ask whether parking is required or an exemption applies. Include any garage conversion, driveway changes and separate entrance in the discussion.

Are there conditions on how the unit is used?

Confirm rental rules, any owner-occupancy condition and any recorded property agreement. Ask separately about junior ADUs or a future separate sale.

Fire safety and access

Can emergency responders reach the unit?

Ask how the required route is measured and kept clear. Show gates and narrow passages; confirm any extra measures before fixing the layout.

Does the fire authority need water-supply information?

Ask whether hydrant location or water-flow records are needed, who provides them and when to request them.

What fire protection does this design need?

Describe the existing home's sprinkler system, if any. Ask about sprinklers, walls, windows, roof edges and separation for the proposed design.

How will the ADU be identified?

Ask how to obtain an address or unit number and where signs must go so visitors and emergency responders can find the entrance.

Utilities and construction access

How will water and wastewater connect?

Identify the water provider and sewer agency, or the septic system. Ask about capacity, connection routes, approvals and any upgrade work.

Is the electrical service suitable?

Discuss the ADU's appliances and heating with your designer and electric utility. Ask about the existing panel, service capacity and upgrade lead times.

Which meters and connection costs are assumed?

Ask each provider about shared or separate meters, connection charges and who arranges the work. Keep written requirements with the budget.

How will the team reach and restore the site?

Discuss delivery and equipment access, excavation, demolition, drainage, fences and yard repairs. For factory-built units, check delivery and lifting access.

Design and application package

Who is responsible for design and permits?

List the designer, engineers and application contact. Agree on scope, fees, drawing ownership and who answers agency comments.

Would an early planning meeting help?

Ask whether preliminary feedback is available, what to bring and whether it costs money. Bring your sketch, property records and unresolved questions.

Is a preapproved plan available and suitable?

Ask whether the jurisdiction offers a program for this project. Confirm site-specific drawings, foundation work and reviews still needed, plus plan-use fees.

What belongs in the application?

Get the current local submission list. Ask about site and building drawings, engineering, energy documents, reports, utility letters, owner signatures and any recorded agreements.

Budget and schedule

Does the budget cover the whole project?

Include design, studies, permits, site work, utility work, construction, your own purchases and a reserve. Mark estimates and items that remain unpriced.

Which agency and utility fees apply?

Request current estimates and payment dates. Ask about plan review, permits, connections and any school or other impact fees, including applicable exemptions.

What is the schedule based on?

Separate design, application review, corrections, permit issuance and construction. Ask which utility appointments, reports or decisions could hold up the next stage.

What will you decide before committing more money?

Set a spending limit and priorities. If renting is part of the plan, use realistic income and expenses; confirm financing and ownership costs with qualified advisers.

From application to permit

How will the application be submitted and tracked?

Confirm the portal or appointment process, file rules and required signatures. Decide who uploads documents, receives notices and keeps the owner informed.

Has the agency accepted a complete package?

Track any missing documents and initial payments. Ask when review begins and how the agency communicates that the application is complete.

Who will handle corrections and resubmittals?

Keep a list of review comments, the person responding and the next submission date. Ask which design-service fees include revision rounds.

What is still needed before construction can start?

Confirm outstanding approvals, payments and permit issuance with the building department. Keep the issued permit and approved drawings, then coordinate the start and inspections with your Contractor.

Use this to prepare a conversation

Confirm requirements with your local planning, building, fire and utility agencies. A completed checklist is not a permit or an eligibility decision.

Adapted from the Step 01 PDF reviewed . Use the PDF worksheet if you want to write down answers and follow-up items, or print this page for reference.