Which agency handles this address?
Find the property address and parcel number. Confirm whether the City or County handles permits; the mailing city alone may not settle this.
Know what to ask before you commit to an ADU.
Use these 32 questions to review your property, plans, utilities, budget and next steps with your project team.
Find the property address and parcel number. Confirm whether the City or County handles permits; the mailing city alone may not settle this.
Gather available permit records and note the existing homes, garages and other structures. Ask which records the building department needs.
Tell the building department about known unpermitted work or open code cases. Ask how each affects this application and what to resolve.
Note who will live there and your must-have features. Describe a separate building, addition or conversion. For a junior ADU, multifamily property or home on wheels, ask which approval path applies.
Bring any survey and title report. An easement gives someone rights to use part of the land. Ask whether a survey or further title review is needed.
Ask about flood, wildfire, earthquake, landslide, coastal and historic designations. Record any extra design work, review or agency contact that applies.
Point out slopes, retaining walls, old foundations, filled pools and drainage concerns. Ask your designer whether soil testing or an engineer is needed.
Mark trees, major roots, walls and structures on a sketch. Ask about protection, removal permits and demolition before choosing the building location.
Record the permitted unit types, floor area and how area is measured. Ask which state and local provisions apply to your property and project.
Confirm height, number of floors, distances from property lines (setbacks), separation from other buildings and any limits on covered yard area.
Ask whether parking is required or an exemption applies. Include any garage conversion, driveway changes and separate entrance in the discussion.
Confirm rental rules, any owner-occupancy condition and any recorded property agreement. Ask separately about junior ADUs or a future separate sale.
Ask how the required route is measured and kept clear. Show gates and narrow passages; confirm any extra measures before fixing the layout.
Ask whether hydrant location or water-flow records are needed, who provides them and when to request them.
Describe the existing home's sprinkler system, if any. Ask about sprinklers, walls, windows, roof edges and separation for the proposed design.
Ask how to obtain an address or unit number and where signs must go so visitors and emergency responders can find the entrance.
Identify the water provider and sewer agency, or the septic system. Ask about capacity, connection routes, approvals and any upgrade work.
Discuss the ADU's appliances and heating with your designer and electric utility. Ask about the existing panel, service capacity and upgrade lead times.
Ask each provider about shared or separate meters, connection charges and who arranges the work. Keep written requirements with the budget.
Discuss delivery and equipment access, excavation, demolition, drainage, fences and yard repairs. For factory-built units, check delivery and lifting access.
List the designer, engineers and application contact. Agree on scope, fees, drawing ownership and who answers agency comments.
Ask whether preliminary feedback is available, what to bring and whether it costs money. Bring your sketch, property records and unresolved questions.
Ask whether the jurisdiction offers a program for this project. Confirm site-specific drawings, foundation work and reviews still needed, plus plan-use fees.
Get the current local submission list. Ask about site and building drawings, engineering, energy documents, reports, utility letters, owner signatures and any recorded agreements.
Include design, studies, permits, site work, utility work, construction, your own purchases and a reserve. Mark estimates and items that remain unpriced.
Request current estimates and payment dates. Ask about plan review, permits, connections and any school or other impact fees, including applicable exemptions.
Separate design, application review, corrections, permit issuance and construction. Ask which utility appointments, reports or decisions could hold up the next stage.
Set a spending limit and priorities. If renting is part of the plan, use realistic income and expenses; confirm financing and ownership costs with qualified advisers.
Confirm the portal or appointment process, file rules and required signatures. Decide who uploads documents, receives notices and keeps the owner informed.
Track any missing documents and initial payments. Ask when review begins and how the agency communicates that the application is complete.
Keep a list of review comments, the person responding and the next submission date. Ask which design-service fees include revision rounds.
Confirm outstanding approvals, payments and permit issuance with the building department. Keep the issued permit and approved drawings, then coordinate the start and inspections with your Contractor.
Confirm requirements with your local planning, building, fire and utility agencies. A completed checklist is not a permit or an eligibility decision.
Adapted from the Step 01 PDF reviewed . Use the PDF worksheet if you want to write down answers and follow-up items, or print this page for reference.