Who issues my rebuild permit in Altadena?
For unincorporated Altadena, County Regional Planning handles zoning and County Public Works handles building review. Start with the official County Jurisdiction Lookup. LA County Regional Planning: Disaster recovery and jurisdiction lookup
The Altadena One-Stop Permit Center is at 464 W. Woodbury Road, Suite 210, Altadena, CA 91001; phone (626) 424-6743. Posted weekday walk-in hours are 8 a.m.–4:30 p.m., with last call for permits at 3 p.m. County Disaster Recovery Permit applications use EPIC-LA and the Unified Permit process introduced in August 2025. LA County: One-Stop Permit Centers
What to do: Look up the parcel, then take the prior-building records and proposed scope to the responsible agency.
How much larger can I rebuild in the County Eaton area?
Ask County Planning to check both the local size allowance and the state environmental-review route. For eligible County Eaton residential replacements, local rules allow 10% or 200 square feet of added footprint and gross floor area, whichever is greater. Setback and safety conditions apply. LA County: Like-for-like rebuilding explained
It depends on: The July 28, 2026 ordinance extends the Eaton interim rules to August 22, 2027. Legally established older setbacks that do not meet today’s rules may be kept. Other rebuilds face current zoning and may need approval beyond staff review. LA County: Eaton interim rebuilding ordinance
For qualifying structures, maximum height is the greater of the old height or current zoning limit, with no added stories. Minor moves can increase setbacks if at least 50% of the former footprint remains and other replacement conditions are met. County ordinance inventory
The state route generally allows no more than 110% of former footprint and height in substantially the same location. Public-access, view-corridor and open-space restrictions, plus separate accessory/ADU criteria, apply. For example, the local 200-square-foot allowance can exceed the state’s 110% footprint limit. The local agency decides eligibility. LA County: Adopted Ordinance 2026-0024U
What to do: Have Planning check your drawings against both tests before pricing added space.
What is different inside the City of Pasadena?
Use Pasadena’s rebuilding page for a City parcel. Its planner map covers fire-damaged properties the City red-tagged; other owners can request a planning consultation. Contact Building & Safety at (626) 744-4200 or BuildingRecovery@CityOfPasadena.net. City of Pasadena: Information on rebuilding
The March 2026 recovery report describes a 10% or 200-square-foot allowance, whichever is greater. Certain older setbacks and heights can remain. A January 14, 2026 presentation targets two weeks for first review and one week for later reviews; corrections and outside approvals add time. City of Pasadena: March 17, 2026 recovery report
The original fee program covers qualifying owner-occupied single-family or condominium red-tagged rebuilds, with ownership, scope and sale-listing conditions. Water-service fees and a $1,000 construction-and-demolition deposit remain. In August 2026, Pasadena added repair-fee relief for eligible owner-occupied standing homes with documented fire damage in evacuation order or warning areas. City of Pasadena: January 14, 2026 Eaton Fire update
What to do: Ask Pasadena which size rules and fee program cover your project.
Where do I apply inside Sierra Madre?
Sierra Madre requires building, plan-check and zoning applications through its Accela Citizen Portal. Its counter is at 232 W. Sierra Madre Boulevard; phone (626) 355-7138. Applicable trades require separate permits, including electrical, plumbing, sewer, demolition and sprinklers. City of Sierra Madre: Building and Safety
What to do: Ask Sierra Madre for its Eaton rebuild conditions and required trade permits before using another jurisdiction’s rules.
What debris and soil records do I need?
County reports Phase 1 hazardous-material removal completed February 27, 2025 and government-sponsored Phase 2 cleanup completed in September 2025. Retrieve your lot’s USACE Final Sign Off or, for private cleanup, the Final Fire Debris Removal Permit Closure in EPIC-LA. County plans can be submitted before cleanup finishes, but permit issuance requires completed Phases 1 and 2. LA County: Phase 1 hazardous-material removal
The February 13, 2025 private-cleanup FAQ requires removal of the upper six inches of soil in the ash footprint to visibly clean soil. Confirmation testing may be required if cleanup proof is inadequate. Foundation/geotechnical review is separate: conventional continuous-footing designs do not always require a soils report, while deep foundations, hazards and basement conditions can. LA County: 2025 wildfire private debris-removal FAQ
County Public Health transferred its soil lead testing program to USC CLEAN on August 15, 2026 and says free lead testing continues through that transition. This tests lead, not every soil contaminant. County post-fire soil testing
What to do: Download the lot’s closure record and ask the reviewer which cleanup evidence and engineering reports remain needed.
How fast is County review, and which fees are covered?
Request the County’s review schedule and fee decision for your project. Like-for-like initial zoning review targets 10 business days and rechecks five; other projects depend on complexity. After full building-plan submission, other permitting departments post 10/5-business-day review timelines. These milestones do not guarantee permit or move-in dates. LA County: Recovery frequently asked questions
Fee relief generally covers primary homes in unincorporated LA County destroyed or irreparably damaged by Eaton or Palisades. The applicant must have owned and occupied the home before January 7, 2025. Related accessory buildings and an owner-occupied standalone ADU awaiting the home rebuild may qualify. LA County: Fee deferrals and refunds
Rentals, commercial and multifamily properties, corporations/LLCs and sold properties are excluded; some beneficial-owner trusts qualify. The current program posts no deadline for eligible relief or refunds. Private design, construction, utilities, school charges, surveys and the recycling deposit remain outside it. County pre-approved designs
Preapproved designs still need site review and permits. Professional self-certification excludes geologically sensitive sites and retains agency clearances, inspections and audits of at least 20% of submissions. LA County: Self-certification pilot
What to do: Get written fee eligibility and a list of remaining clearances before selecting a review route.
Can I live in an ADU or RV while rebuilding?
Get written approval before living in an ADU or temporary unit. N-9-25 allows qualifying ADU occupancy before the main home. Its stated three-year suspension runs January 16, 2025–January 16, 2028, unless ended sooner. Governor: Executive Order N-9-25, January 16, 2025
Separate County rules allow qualifying standalone-ADU occupancy while awaiting the home rebuild until January 7, 2030. That date does not extend the interim ordinance beyond August 22, 2027. LA County: Eaton interim rebuilding ordinance
County RV, mobilehome and manufactured-home placement needs a Disaster Recovery Permit, cleared space, water, waste disposal and electricity. The County FAQ allows two years after declaration, with up to three discretionary one-year extensions. Removal is required within 24 hours after approval expires, or otherwise within 30 days after the replacement home’s occupancy certificate. County ordinance inventory
What to do: Resolve your permit dates and extension decision before January 7, 2027. Confirm later-law conditions; state orders do not automatically extend local approval.
Does Altadena have a blanket SB 9 ban?
Ask Planning to check both maps before pursuing SB 9. No County-wide or Altadena-wide ban is established here. The January 2026 County memo excludes sites inside both the Eaton/Palisades boundaries and a State Fire Marshal very-high-hazard zone from its staff-approval process. LA County Regional Planning: January 2026 SB 9 memorandum
SB 1090 concerns a different law. Cal OES describes a pause on specified Starter Home Revitalization Act staff-approval requirements for housing and subdivision in ZIP Codes 91001 and 91003. It covers applications submitted from October 1, 2026 until January 1, 2030, with exceptions. This does not create a blanket ADU or SB 9 ban. California Senate: Significant legislation of 2026, SB 1090
What to do: Have Planning check the maps and application-specific exceptions in the final law.
Who reconnects water, electricity and gas?
Identify the water provider in the County Service Locator. The March 11, 2026 referral lists Las Flores, Lincoln Avenue, Rubio Cañon, Kinneloa and Pasadena Water & Power. County requires a water Will-Serve letter for new residential buildings and an SCE application ID for rebuilds, ADUs, panels and temporary power. LA County: March 11, 2026 fire rebuild agency referral
SCE’s rebuild map includes overhead and underground work; individual service work can continue after neighborhood infrastructure is finished. SoCalGas asks owners to request restoration during planning, before construction, and says a planner will contact them within five business days; authorized personnel handle reconnection. Southern California Edison: Electric rebuild progress
SoCalGas posts December 31, 2026 for qualifying January 2025 wildfire rebate applications. Its residential efficient-fire-rebuild program also requires application before construction starts. SoCalGas: Wildfire rebuilding and rebates
What to do: Request the water letter and SCE project ID, then check gas-program eligibility and the preconstruction requirement immediately.
When is the Eaton property-tax claim due?
File or verify your Eaton damage claim now. SB 663 gives Misfortune & Calamity (M&C) claims 24 months from loss or the later county period, effective October 10, 2025. For a January 7, 2025 loss, that calculates to January 7, 2027; confirm the Assessor’s recognized loss date. Damage must be at least $10,000 in current market value. BOE: Publication 802, disaster property-tax relief
Separate same-site relief gives qualifying Eaton reconstruction eight years. It generally requires damage exceeding 50% of improvement value and the disaster-time owner. Its 120% test measures comparable market value; excess value can be assessed. You cannot combine this exclusion with transferring the tax base to another property. Assessor disaster claim announcement
What to do: Ask the Assessor to confirm your claim deadline and separate reconstruction conditions in writing.
Do fire-safety rules and Zone 0 apply to my rebuild?
Covered County rebuilds retain applicable fire-resistant exterior requirements. The March 11, 2026 referral requires interior sprinklers in new single-family homes, ADUs and duplexes. Coordinate sprinkler and vegetation-management clearances during construction before final approval. LA County: Like-for-like rebuilding explained
N-37-25 allows covered residential rebuilds to use most 2022-code provisions while retaining specified 2025 fire/public-safety rules and flood-elevation requirements. Solar and battery installation relief retains solar-ready duties. N-20-25 gives qualifying LA County disaster-rebuild permits three years from issuance; confirm the individual permit and extension conditions. Governor: Executive Order N-37-25, November 24, 2025
As checked November 21, 2026, revised statewide Zone 0 file 2026-1116-02E remained under OAL review after its November 16 submission. Final effectiveness is not established by that entry; existing local fire and defensible-space requirements continue independently. Board of Forestry: November 2026 Zone 0 finding of emergency
. OAL: Emergency regulations under review
What to do: Ask the building and fire reviewers to identify your parcel’s applicable construction and landscape requirements.
Which deadlines should Eaton Fire owners watch?
| Date | What it means |
|---|---|
| December 31, 2026 | Qualifying SoCalGas rebates; some programs require applying before construction. SoCalGas: Wildfire rebuilding and rebates |
| January 7, 2027 | Calculated M&C date for a January 7, 2025 loss; confirm the recognized loss date and any later County period. BOE: Publication 802, disaster property-tax relief |
| Before January 7, 2027 | Resolve individual County temporary-housing permit dates and discretionary extensions. LA County: Recovery frequently asked questions |
| August 22, 2027 | Eaton interim ordinance’s stated sunset under the July 2026 extension. County ordinance inventory |
| January 16, 2028 | Stated N-9-25 ADU-first suspension endpoint, unless ended sooner. Governor: Executive Order N-9-25, January 16, 2025 |
| January 7, 2030 | Separate County standalone-ADU occupancy endpoint; not the ordinance sunset. LA County: Eaton interim rebuilding ordinance |
What to do: Add the applicable dates to your project calendar and retain written confirmations.
What else should I know?
Can I submit County rebuild plans before debris clearance?
Yes. County accepts applications before debris clearance, but Phases 1 and 2 must be completed before permit issuance.
LA County: Apply for rebuild permits
Link to this answerDoes a Pasadena mailing address mean Pasadena issues my permit?
No. Confirm the parcel with the County Jurisdiction Lookup; unincorporated Altadena uses County Planning and Public Works.
LA County Regional Planning: Disaster recovery and jurisdiction lookup
Link to this answerSources
- LA County Regional Planning: Disaster recovery and jurisdiction lookup
- City of Sierra Madre: Building and Safety
- LA County: One-Stop Permit Centers
- LA County: Start your permit application
- LA County: Like-for-like rebuilding explained
- LA County: Eaton interim rebuilding ordinance
- County ordinance inventory
- LA County: Adopted Ordinance 2026-0024U
- Governor: Executive Order N-20-25, February 13, 2025
- City of Pasadena: Information on rebuilding
- City of Pasadena: March 17, 2026 recovery report
- City of Pasadena: January 14, 2026 Eaton Fire update
- City of Pasadena: Fire rebuild fee waiver and refund program
- City of Pasadena: September 3, 2026 newsletter, standing-home fee relief
- LA County: Phase 1 hazardous-material removal
- Debris final records
- LA County: Apply for rebuild permits
- LA County: 2025 wildfire private debris-removal FAQ
- LA County: Recovery frequently asked questions
- County post-fire soil testing
- LA County: Fee deferrals and refunds
- County pre-approved designs
- LA County: Self-certification pilot
- Governor: Executive Order N-9-25, January 16, 2025
- LA County: Temporary housing
- LA County Regional Planning: January 2026 SB 9 memorandum
- California Senate: Significant legislation of 2026, SB 1090
- Cal OES: 2026 legislative report, SB 1090
- LA County: March 11, 2026 fire rebuild agency referral
- Southern California Edison: Electric rebuild progress
- SoCalGas: Wildfire rebuilding and rebates
- BOE: Publication 802, disaster property-tax relief
- Assessor disaster claim announcement
- Governor: Executive Order N-37-25, November 24, 2025
- Board of Forestry: November 2026 Zone 0 finding of emergency
- OAL: Emergency regulations under review
- LA County Fire: January 2026 defensible-space notice FAQ
- OAL: Emergency regulations under review
Sources checked on November 21, 2026. Rules can change and can differ by property; confirm details with the agency reviewing your project.